Skip to content

Generate bindings

Generate bindings #77

Triggered via schedule October 28, 2025 02:03
Status Failure
Total duration 31m 1s
Artifacts

generate-bindings.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (rolling)
The process '/usr/bin/sudo' failed with exit code 100
build (kilted)
The strategy configuration was canceled because "build.rolling" failed
build (kilted)
The operation was canceled.
build (jazzy)
The strategy configuration was canceled because "build.rolling" failed
build (jazzy)
The operation was canceled.
build (humble)
The strategy configuration was canceled because "build.rolling" failed
build (humble)
The operation was canceled.