Skip to content

Reintegrate upstream #181

Reintegrate upstream

Reintegrate upstream #181

Triggered via pull request April 9, 2025 06:16
Status Failure
Total duration 42s
Artifacts

main.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
ruby 3.3
Process completed with exit code 1.
ruby 3.1
Process completed with exit code 1.
ruby 3.1
The strategy configuration was canceled because "build._3_3" failed
ruby 3.2
Process completed with exit code 1.
ruby 3.2
The strategy configuration was canceled because "build._3_3" failed
ruby 3.0
The operation was canceled.
ruby 3.0
The strategy configuration was canceled because "build._3_3" failed
ruby 2.7
The operation was canceled.
ruby 2.7
The strategy configuration was canceled because "build._3_3" failed