Added support for parameter generator library #2659
main.yml
on: pull_request
configure
4s
Pre-commit checks
55s
Matrix: Run tests
Annotations
8 errors
Pre-commit checks
Process completed with exit code 1.
|
Run tests (., clang, bzlmod)
Process completed with exit code 3.
|
Run tests (., clang, workspace)
The operation was canceled.
|
Run tests (., clang, workspace)
The strategy configuration was canceled because "test._clang_bzlmod" failed
|
Run tests (., gcc, workspace)
The operation was canceled.
|
Run tests (., gcc, workspace)
The strategy configuration was canceled because "test._clang_bzlmod" failed
|
Run tests (., gcc, bzlmod)
The operation was canceled.
|
Run tests (., gcc, bzlmod)
The strategy configuration was canceled because "test._clang_bzlmod" failed
|