Skip to content

Workflow consistency and refactor #5312

Workflow consistency and refactor

Workflow consistency and refactor #5312

Triggered via pull request October 8, 2025 14:34
Status Cancelled
Total duration 28m 44s
Artifacts 5

ci.yaml

on: pull_request
deploy-test  /  Deploy Wasp app
18m 9s
deploy-test / Deploy Wasp app
Matrix: waspc-build / build
formatting  /  prettier
40s
formatting / prettier
formatting  /  ormolu
22s
formatting / ormolu
starters-test  /  Test wasp-config
6m 20s
starters-test / Test wasp-config
tsspec-test  /  Test wasp-config
33s
tsspec-test / Test wasp-config
Matrix: examples-test / Test Example Apps
Matrix: waspc-test / Build Wasp
deploy-test  /  Run smoke tests on deployed app
4s
deploy-test / Run smoke tests on deployed app
waspc-build  /  build-universal
41s
waspc-build / build-universal
deploy-test  /  Clean up deployed Fly app
7s
deploy-test / Clean up deployed Fly app
Fit to window
Zoom out
Zoom in

Annotations

11 errors
waspc-test / Build Wasp (ubuntu-22.04, latest, 8.10.7, 3.10.2.0)
The operation was canceled.
waspc-test / Build Wasp (ubuntu-22.04, latest, 8.10.7, 3.10.2.0)
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/3238/merge exists
waspc-test / Build Wasp (macos-13, latest, 8.10.7, 3.10.2.0)
The operation was canceled.
waspc-test / Build Wasp (macos-13, latest, 8.10.7, 3.10.2.0)
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/3238/merge exists
waspc-test / Build Wasp (ubuntu-22.04, 22, 8.10.7, 3.10.2.0)
The operation was canceled.
waspc-test / Build Wasp (ubuntu-22.04, 22, 8.10.7, 3.10.2.0)
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/3238/merge exists
waspc-test / Build Wasp (ubuntu-22.04, 24, 8.10.7, 3.10.2.0)
The operation was canceled.
waspc-test / Build Wasp (ubuntu-22.04, 24, 8.10.7, 3.10.2.0)
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/3238/merge exists
waspc-test / Build Wasp (windows-latest, latest, 8.10.7, 3.10.2.0)
The operation was canceled.
waspc-test / Build Wasp (windows-latest, latest, 8.10.7, 3.10.2.0)
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/3238/merge exists
Continuous Integration
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/3238/merge exists

Artifacts

Produced during runtime
Name Size Digest
wasp-cli-linux-x86_64
81.8 MB
sha256:9bc9cba39698f46aa94a5fee687d108d07dcd77be215228ea38a0b8e60088768
wasp-cli-linux-x86_64-static
78.9 MB
sha256:4297589d0237cfbfc372d2b126188bfcfaa66d0bbdedd25a6d3ab0c090c178a1
wasp-cli-macos-aarch64
74.7 MB
sha256:42ae657d1d23e0c3a93d53be3080554826dbe7601c8e5e2a46531c4bb1321406
wasp-cli-macos-universal
82.5 MB
sha256:23d9c9d8d9046c7997b974d13560c947609504fe126fa1a9af1b718bf36135f7
wasp-cli-macos-x86_64
51.3 MB
sha256:af41e72bd7c141b78e682923fbe403bf507473492627d4aa84bad5c9f00b7c9b