Skip to content

Connection

Connection #2

Triggered via pull request March 27, 2025 11:22
@adam-fowleradam-fowler
synchronize #3
connection
Status Cancelled
Total duration 14m 35s
Artifacts

ci.yml

on: pull_request
Matrix: linux
Fit to window
Zoom out
Zoom in

Annotations

7 errors
linux (swift:6.0)
The operation was canceled.
linux (swift:6.0)
The run was canceled by @adam-fowler.
linux (swiftlang/swift:nightly-6.1-jammy)
The operation was canceled.
linux (swiftlang/swift:nightly-6.1-jammy)
The run was canceled by @adam-fowler.
CI
The run was canceled by @adam-fowler.
macos
The operation was canceled.
macos
The run was canceled by @adam-fowler.