build(deps): Bump the npm_and_yarn group across 6 directories with 1 update #27315
CI.yml
on: pull_request
optimize_ci
3s
Build Packages
36s
Lint Packages
35s
Unit Tests
1m 22s
Size
1m 20s
Matrix: E2E Tests
Annotations
9 errors and 8 warnings
Build Packages
Process completed with exit code 1.
|
Lint Packages
Process completed with exit code 1.
|
E2E Tests (pnpm, vite)
Process completed with exit code 1.
|
E2E Tests (pnpm, webpack)
Process completed with exit code 1.
|
E2E Tests (pnpm, webpack)
The strategy configuration was canceled because "e2e.pnpm_vite" failed
|
E2E Tests (pnpm, esbuild)
Process completed with exit code 1.
|
E2E Tests (pnpm, esbuild)
The strategy configuration was canceled because "e2e.pnpm_vite" failed
|
Unit Tests
Process completed with exit code 1.
|
Size
Process completed with exit code 1.
|
optimize_ci
Invalid authentication. Skipping Graphite checks.
|
Build Packages
Failed to restore: Cache service responded with 400
|
Lint Packages
Failed to restore: Cache service responded with 400
|
E2E Tests (pnpm, vite)
Failed to restore: Cache service responded with 400
|
E2E Tests (pnpm, webpack)
Failed to restore: Cache service responded with 400
|
E2E Tests (pnpm, esbuild)
Failed to restore: Cache service responded with 400
|
Unit Tests
Failed to restore: Cache service responded with 400
|
Size
Failed to restore: Cache service responded with 400
|