WebsiteDocuments

This is Part of our private documents, which we think can be shown to you.

Updating this repository is a manual process, which means it will not be precisely up-to-date. But we will maintain it at least once a week.

Repository last updated: Nov 17th

Maintainer: Yiming Tang (baisebaoma)

Near Deadline

12.10 Interim Report

Emails

Dr. Heshan Heshan.Du@nottingham.edu.cn

Ruizi Han (20125115) biyrh2@nottingham.edu.cn

Shiliang Chen (20125016) scysc1@nottingham.edu.cn

Yani Huang (20125915) scyyh7@nottingham.edu.cn

Yijie Lu (20125931) scyyl9@nottingham.edu.cn

Yiming Tang (20126870) scyyt1@nottingham.edu.cn

Yuting Jiang (20126307) scyyj2@nottingham.edu.cn

Division of Labour

  • Team Leader: Shiliang Chen
  • UI Designer: Yiming Tang, Yani Huang
  • Technical Leader: Shiliang Chen
  • Quality Assurance Leader: Yijie Lu, Yuting Jiang
  • Report Editor: Yani Huang, Yuting Jiang ,Ruizi Han
  • Repository Master: Ruizi Han, Yiming Tang
  • Monitor (Tester): Yani Huang, Shiliang Chen

Languages

中文(zh_CN): China mainland simplified Chinese

English (EN_GB): Great Britain English

This folder contains minutes in Markdown.

Markdown files is easy to use.

Filename Specification

中文模板 (Chinese template):模板_最后修改人缩写_时间_版本.md

e.g.: 模板_TYM_1014_v1.md

English template:Template_name_time_version.md

e.g.: Template_TYM_0930_v1.md

Use newest version of template

Minutes

中文: 次数_时间_是否正式_主持人缩写记录人缩写_版本.md

e.g.: 3_0930_否_CSLHRZ_Final.md,

English: No._Time_WhetherFormal_names_Version.md

e.g.: 5_1014_T_TYMJYT_Final.md

  • WhetherFormal: T for True and F for false (informal).
  • Version:This is about our specified minute writing procedure. For short, A->M->Final. Final version must be uploaded.

Finished, but in this repository we show our P20 bid only.

CVs not included.

Timeline

Sep. 30th

1st informal meeting

know each other, choose our projects and start writing bid

Oct. 4th

2nd informal meeting

First edition bids discuss

Oct. 6th

3rd informal meeting

Examine bids and cvs, prepare to upload

Oct. 8th

Awarded Project 20, prepare to start the project

Oct. 10th

4th informal meeting

prepare for 1st formal meeting questions

Oct. 15th

1st formal meeting

introduce members and discuss about the project and its requirements

Oct. 20th

5th informal meeting

Website, ethics and requirements discussed, confirmed target users, market research methods (questionnaire and interview)

Oct. 21th

First version of ethics form, survey, consent form finished

Oct. 22th

2th formal meeting

Questions about correctness, requirements and survey discussed, ethics form confirmed

Oct. 23th

Ethics form email sent

Oct. 24th

  1. LaTeX to be learnt
  2. Correctness implementation scheme to be determined
  3. Interview questions to be determined

Oct. 27th

6th informal meeting

Details of survey and two implementation of correctness discussed, website put into use. Interview basic quesions got.

Oct. 28th

3rd formal meeting

Website, survey, some of the interview quetsions, correctness implementation scheme, requirements writing confirmed.

Prepare for literature review, Interim Report, questionnaire and interview.

Nov. 4th

Ethics attachment updated

Nov. 5th

Decided to havae the last chairperson review what we have done last week, before any informal meeting

literature review first version of paragraph ddl 2020/11/09

Focus group questions will be further determined in 2020/11/06~2020/11/07

Requirement will be done expected in 4 to 5 days after Dave's approval

Nov. 6th

Learn LaTex

Focus group (y1 & y2) in 7th, y3 one will be held next week

Questionnaire ready to post

Prototype mini version to be produced (any idea by any member is acceptable)

Nov. 7th

Focus group (y1 & y2) done

Nov. 10th

Questionnaire result analysis, focus group analysis, prototype and interview discussed.

Nov. 11th

VIP session. We gathered useful ideas from them.

Nov. 12th

Formal meeting.

Requirement Engineering process, questionnaire and focus group reported to Dr. Heshan

Questions about deciding either functionality or playfulness. Dr. Heshan says they are not confilct.