In this project, we used ETAP to analyze the IEEE 39-bus system, added PV generators and a large industrial load, and observed their impact through load flow and fault analysis.

Notifications You must be signed in to change notification settings

suvom027/Investigating-the-effect-of-a-large-industrial-loads-in-IEEE-39-bus-network

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

4 Commits
 
 
 
 

Repository files navigation

IEEE 39-Bus System Analysis with Industrial Load and PV Integration

Table of Contents


Introduction

This project focuses on analyzing the IEEE 39-bus power system network. The main objective was to observe the impact of integrating photovoltaic (PV) generators and large industrial loads into the system. We used load flow and fault analysis to study how these additions affect system performance.


System Description

The IEEE 39-bus system, also known as the New England power system, contains 39 buses, 10 generators, and multiple loads and transformers. The nominal frequency is 50 Hz. This system is often used for stability and fault analysis in power systems.


Tasks

Task 1 & 2:
Performed load flow analysis on the base IEEE 39-bus system without any modifications. The load flow successfully converged, meaning the input data was correct.

Task 3:
We modified the generators connected at buses 32, 33, 34, and 36 to work as PV generators. The fault current for PVs was assumed to be equal to their rated current. We then did fault analysis at those buses.

Task 4 & 5:
We added an industrial plant (modeled as an induction motor) at Bus 23. After adding it, we performed load flow again to see how the system changed. The motor had a rating of 100 MVA with 0.8 power factor and 90% efficiency.


Modifications

  • PV Generator Assumptions:

    • Power factor: 0.9
    • Qmax = 0.2 × MVA
    • Qmin = –0.2 × MVA
  • Industrial Load (Induction Motor):

    • Bus: 23
    • Voltage: 345 kV
    • Efficiency: 90%
    • MVA rating: 100 MVA
    • Power factor: 0.8
    • KW rating: 72,000 kW
    • R = 0.00556, X = 0.3

Simulation Results

  • The base case load flow converged, confirming correct data entry.
  • After converting selected generators to PV, the system behaved differently, especially in fault responses.
  • Adding the induction motor increased the loading at Bus 23. Voltage slightly dropped and nearby buses also showed changes in power flow.
  • Compared to the base case, the modified system had noticeable changes in voltage profiles and line loadings.


Conclusion

We successfully analyzed the IEEE 39-bus system under different scenarios. Adding PV generators and a large industrial load had a clear effect on system performance. This project helped us understand the behavior of power systems under real-world conditions like renewable integration and large-scale industrial consumption.


About

In this project, we used ETAP to analyze the IEEE 39-bus system, added PV generators and a large industrial load, and observed their impact through load flow and fault analysis.

Topics

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published