Note
Except for sharing code, you are encouraged to communicate in any form with other classmates
on this assignment. The code is to be your individual work.
Goals
- Become familiar with programming in C
- Become familiar with test-driven development
- Learn how to read input from the command line and from the console and to format output for the console.
- Review basic variables, control structures, loops
- Practice programming logic
Task
In this assignment you will create a program to generate a Calendar for a given year. This program will take the year number as a program argument. If no program arguments are specified, the program will ask the user to enter a year number instead. A Calendar will be generated and output based on the year number (See Figure 1). The Calendar output should look exactly like the one in the figure, including all formatting and spacing.
This program will be broken up into several sub-tasks, which will be done using functions. The specifications for each function are listed below. Your main program should use these functions when generating the calendar.
You will be provided an Autograder, to help you check your work, prior to submission.
Function List
is_leap_year
Description:
This function determines if a given year is a leap year. The modern rule for leap years
came into effect with the Gregorian Calendar, which was not adopted in the colonies
which later formed the United States until 1752. Therefore if the year entered is less than
1752, the function should return -1. A year is considered a leap year if it is divisible by
four. If the year is divisible by 100 it is not considered a leap year unless it is also
divisible by 400.
Parameters:
int year_number: The year number.
Return Value:
An integer representing if the given year is a leap year. Returns 0 is the year is
not a leap year, 1 if the year is a leap year, and -1 if the year was less than 1752.
calculate_days_in_month
Description:
This function calculates the number of days for a given month (in a given year). You
may lookup how many days each month has.
Parameters:
int year_number: The year number.
int month_number: The month number. January is 0.
Return Value:
Return an integer for the number of days in the month. Return -1 for any invalid
input (including if the year was < 1752).
calculate_day_of_week
Description:
See Wikipedia, https://en.wikipedia.org/wiki/Determination_of_the_day_of_the_week
This webpage has a worked example; you might benefit from checking it.
The description is reproduced here for your convenience:
Disparate variation [edit]
Takes in an integer year, an integer day, and an integer month.
Parameters:
int day_of_month: The day of the month
int month_number: The month number. January is 0.
int year_number: The year number.
Return Value:
Return an integer to represent the day of the week. Sunday is 0. Return -1 for all
invalid input (including if the year was < 1752).
w = (d + floor(2.6*m -0.2) + y + floor(y/4) + floor (c/4) -2c ) mod 7
where
- Y is the year minus 1 for January or February, and the year for any other month
- y is the last 2 digits of Y
- c is the first 2 digits of Y
- d is the day of the month (1 to 31)
- m is the shifted month (March=1,...,February=12)
- w is the day of week (0=Sunday,...,6=Saturday). If w is negative you have to add 7 to it.
Files
You should have a .c source file containing the main function for your program. It must be named “HW1.c”. In addition to this file you must have the following files named exactly as shown. These additional files will be used for testing the individual functionality of each function. Excepting HW1.c, you should have a .h file for each .c file. Use the starter files archive given to you on Canvas for HW1, import it into Eclipse, and extend the code. Remember to submit a project that compiles and runs. Partial credit can be earned for partially completed work, so long as it compiles and runs (which the starter files do). Don’t forget to include the library m, so that there is code for the floor function.
test.c, test.h
Retain these files. You might not have needed to change it at all.
production.c, production.h
Update the “is_leap_year” function. Include any constants above the function if they are
needed inside the function. Also include all necessary #include statements.
Update the “calculate_days_in_month” function. Include any constants above the
function if they are needed inside the function. Also include all necessary #include
statements.
Update the “calculate_day_of_week” function. Include any constants above the function