scylla_repository: cache setups #364
ci-tests.yml
on: pull_request
CCM Integration tests (using Nix)
/
build
7m 17s
Matrix: CCM Integration tests / build
Annotations
6 errors and 3 warnings
|
CCM Integration tests (using Nix) / build
Process completed with exit code 1.
|
|
CCM Integration tests / build (3.11)
Process completed with exit code 1.
|
|
CCM Integration tests / build (3.13)
The job was canceled because "_3_11" failed.
|
|
CCM Integration tests / build (3.13)
Process completed with exit code 1.
|
|
CCM Integration tests / build (3.12)
The job was canceled because "_3_11" failed.
|
|
CCM Integration tests / build (3.12)
The operation was canceled.
|
|
CCM Integration tests / build (3.11)
No file matched to [**/uv.lock,**/requirements*.txt]. The cache will never get invalidated. Make sure you have checked out the target repository and configured the cache-dependency-glob input correctly.
|
|
CCM Integration tests / build (3.13)
No file matched to [**/uv.lock,**/requirements*.txt]. The cache will never get invalidated. Make sure you have checked out the target repository and configured the cache-dependency-glob input correctly.
|
|
CCM Integration tests / build (3.12)
No file matched to [**/uv.lock,**/requirements*.txt]. The cache will never get invalidated. Make sure you have checked out the target repository and configured the cache-dependency-glob input correctly.
|