Skip to content

Add comprehensive integration test suite for qnap-docker #3

Add comprehensive integration test suite for qnap-docker

Add comprehensive integration test suite for qnap-docker #3

Triggered via push September 14, 2025 23:57
Status Failure
Total duration 1m 22s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (1.23)
Process completed with exit code 2.
test (1.22)
The operation was canceled.
test (1.22)
The strategy configuration was canceled because "test._1_23" failed
test (1.21)
The operation was canceled.
test (1.21)
The strategy configuration was canceled because "test._1_23" failed