Skip to content

chore: bump version to 2.3.0 and add Git workflow guidelines #20

chore: bump version to 2.3.0 and add Git workflow guidelines

chore: bump version to 2.3.0 and add Git workflow guidelines #20

Triggered via pull request September 24, 2025 05:03
Status Failure
Total duration 30s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (16)
Process completed with exit code 130.
test (24)
Process completed with exit code 1.
test (24)
The strategy configuration was canceled because "test._16" failed
test (20)
The operation was canceled.
test (20)
The strategy configuration was canceled because "test._16" failed
test (18)
The operation was canceled.
test (18)
The strategy configuration was canceled because "test._16" failed
test (22)
The operation was canceled.
test (22)
The strategy configuration was canceled because "test._16" failed