Skip to content

Add rosbag2 keyboard handler patch #2673

Add rosbag2 keyboard handler patch

Add rosbag2 keyboard handler patch #2673

Triggered via pull request October 14, 2025 12:37
Status Failure
Total duration 10m 15s
Artifacts

main.yml

on: pull_request
configure
3s
configure
Pre-commit checks
1m 34s
Pre-commit checks
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run tests (., gcc, bzlmod)
Process completed with exit code 3.
Run tests (., clang, workspace)
The operation was canceled.
Run tests (., clang, workspace)
The strategy configuration was canceled because "test._gcc_bzlmod" failed
Run tests (., gcc, workspace)
The operation was canceled.
Run tests (., gcc, workspace)
The strategy configuration was canceled because "test._gcc_bzlmod" failed
Run tests (., clang, bzlmod)
The operation was canceled.
Run tests (., clang, bzlmod)
The strategy configuration was canceled because "test._gcc_bzlmod" failed