chore(deps): update pre-commit-deps (major) #2606
main.yml
on: pull_request
configure
3s
Pre-commit checks
1m 27s
Matrix: Run tests
Annotations
10 errors
Pre-commit checks
Process completed with exit code 1.
|
Run tests (., gcc, workspace)
The operation was canceled.
|
Run tests (., gcc, workspace)
Canceling since a higher priority waiting request for Testing-521 exists
|
Run tests (., clang, bzlmod)
The operation was canceled.
|
Run tests (., clang, bzlmod)
Canceling since a higher priority waiting request for Testing-521 exists
|
Run tests (., clang, workspace)
The operation was canceled.
|
Run tests (., clang, workspace)
Canceling since a higher priority waiting request for Testing-521 exists
|
Testing
Canceling since a higher priority waiting request for Testing-521 exists
|
Run tests (., gcc, bzlmod)
The operation was canceled.
|
Run tests (., gcc, bzlmod)
Canceling since a higher priority waiting request for Testing-521 exists
|