Skip to content

chore(deps): update pre-commit-deps (major) #2606

chore(deps): update pre-commit-deps (major)

chore(deps): update pre-commit-deps (major) #2606

Triggered via pull request October 4, 2025 16:40
Status Cancelled
Total duration 4m 46s
Artifacts

main.yml

on: pull_request
configure
3s
configure
Pre-commit checks
1m 27s
Pre-commit checks
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Pre-commit checks
Process completed with exit code 1.
Run tests (., gcc, workspace)
The operation was canceled.
Run tests (., gcc, workspace)
Canceling since a higher priority waiting request for Testing-521 exists
Run tests (., clang, bzlmod)
The operation was canceled.
Run tests (., clang, bzlmod)
Canceling since a higher priority waiting request for Testing-521 exists
Run tests (., clang, workspace)
The operation was canceled.
Run tests (., clang, workspace)
Canceling since a higher priority waiting request for Testing-521 exists
Testing
Canceling since a higher priority waiting request for Testing-521 exists
Run tests (., gcc, bzlmod)
The operation was canceled.
Run tests (., gcc, bzlmod)
Canceling since a higher priority waiting request for Testing-521 exists