Skip to content

feat: new Link component (WIP) #469

feat: new Link component (WIP)

feat: new Link component (WIP) #469

Triggered via push September 8, 2025 22:25
Status Failure
Total duration 1m 47s
Artifacts

verify.yml

on: push
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Tests (20, Gemfile.rails_7_2)
Process completed with exit code 1.
Tests (23, Gemfile.rails_7_2)
The operation was canceled.
Tests (23, Gemfile.rails_7_2)
The strategy configuration was canceled because "tests._20_Gemfile_rails_7_2" failed
Tests (23, Gemfile)
The operation was canceled.
Tests (23, Gemfile)
The strategy configuration was canceled because "tests._20_Gemfile_rails_7_2" failed
Tests (20, Gemfile)
The operation was canceled.
Tests (20, Gemfile)
The strategy configuration was canceled because "tests._20_Gemfile_rails_7_2" failed