Skip to content

hustModo/Fixed-Type-Multi-Robot-Collaborative-Flexible-Job-Shop-Scheduling-Problem-Dataset

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

12 Commits
 
 
 
 
 
 

Repository files navigation

Fixed-Type-Multi-Robot-Collaborative-Flexible-Job-Shop-Scheduling-Dataset

These cases vary by task counts (10, 15, 20, and 30), two sub-task counts (5 and 10), each task having one collaborative sub-task, and collaborative robot count options of 2, 3, and 4. Additionally, 50% of the non-collaborative sub-tasks are optionally processed, with up to three optional robots per sub-task. Each sub-task time is uniformly distributed in the range of [10, 100].

J. Huang, X. Li and L. Gao, "A Novel GA-CP Method for Fixed-Type Multi-Robot Collaborative Scheduling in Flexible Job Shop," in IEEE Transactions on Automation Science and Engineering, doi: 10.1109/TASE.2025.3554019.

About

No description, website, or topics provided.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published