Add retry mechanism for transient API errors (503, 429, timeouts) #479
Triggered via pull request
September 27, 2025 02:20
Status
Failure
Total duration
2m 28s
Artifacts
–
ci.yaml
on: pull_request
live-api-tests
0s
plugin-integration-test
0s
ollama-integration-test
0s
Annotations
5 errors
test (3.11)
Process completed with exit code 255.
|
test (3.12)
The operation was canceled.
|
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
|
test (3.10)
The operation was canceled.
|
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
|