Skip to content

Bump actions/setup-go from 5 to 6 (#1465) #6

Bump actions/setup-go from 5 to 6 (#1465)

Bump actions/setup-go from 5 to 6 (#1465) #6

Triggered via push September 8, 2025 14:59
Status Failure
Total duration 26s
Artifacts

go.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (1.23.x, ubuntu-latest)
Process completed with exit code 1.
test (1.25.x, ubuntu-latest)
The operation was canceled.
test (1.25.x, ubuntu-latest)
The strategy configuration was canceled because "test._1_23_x_ubuntu-latest" failed
test (1.24.x, ubuntu-latest)
The operation was canceled.
test (1.24.x, ubuntu-latest)
The strategy configuration was canceled because "test._1_23_x_ubuntu-latest" failed