Skip to content

Add more distros

Add more distros #12

Triggered via pull request October 12, 2025 16:02
@amezinamezin
synchronize #1
more-distros
Status Failure
Total duration 11m 1s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (ubuntu-25.10)
Process completed with exit code 1.
test (opensuse-tumbleweed)
The operation was canceled.
test (opensuse-tumbleweed)
The job has exceeded the maximum execution time of 10m0s
test (opensuse-leap-15.6)
The operation was canceled.
test (opensuse-leap-15.6)
The job has exceeded the maximum execution time of 10m0s
test (opensuse-leap-16.0)
The operation was canceled.
test (opensuse-leap-16.0)
The job has exceeded the maximum execution time of 10m0s