Integration tests #537
scheduled_integration_test.yaml
on: schedule
integration-tests
/
Plan
13s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
Matrix: integration-tests / scan
integration-tests
/
Required Integration Test Status Checks
3s
allure-report
/
Publish Allure report
1m 44s
Annotations
4 errors
|
integration-tests / Build charm (synapse)
The process '/snap/bin/charmcraft' failed with exit code 1
|
|
integration-tests / Build rock (synapse)
The strategy configuration was canceled because "integration-tests.build.charm_synapse_charmcraft_" failed
|
|
integration-tests / Build rock (synapse)
The operation was canceled.
|
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-10-22T06-05-30-aa70__plan
|
329 Bytes |
sha256:d61f5e50da7481e6ee409e9247227363fc98115d29ef3498f50bf3534755348e
|
|