upgrading bdk_wallet to version 2.1 #229
cont_integration.yml
on: pull_request
Rust fmt
19s
Matrix: Build and test
Annotations
4 errors
Build and test (1.75.0)
Process completed with exit code 101.
|
Build and test (1.89.0)
The operation was canceled.
|
Build and test (1.89.0)
The strategy configuration was canceled because "build-test._1_75_0" failed
|
Rust fmt
Process completed with exit code 1.
|