Skip to content

Merge pull request #205 from YPCrumble/feature/upgrade-ubuntu-24 #259

Merge pull request #205 from YPCrumble/feature/upgrade-ubuntu-24

Merge pull request #205 from YPCrumble/feature/upgrade-ubuntu-24 #259

Triggered via push May 27, 2025 11:56
Status Failure
Total duration 3m 30s
Artifacts

molecule.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 2 warnings
build (3.11)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.11)
The runner was not able to contact the cache service. Caching will be skipped
build (3.10)
The runner was not able to contact the cache service. Caching will be skipped