Weekly Slow Unit Tests #211
run_slow_unit_tests.yml
on: schedule
Matrix: REST Client
Matrix: Events
Matrix: Metrics
Matrix: NWM Client
Matrix: NWIS Client
Matrix: SVI Client
Annotations
12 errors
|
SVI Client (3.11)
Process completed with exit code 1.
|
|
NWIS Client (3.9)
Process completed with exit code 1.
|
|
NWIS Client (3.10)
Process completed with exit code 1.
|
|
NWIS Client (3.11)
Process completed with exit code 1.
|
|
SVI Client (3.9)
The operation was canceled.
|
|
SVI Client (3.9)
The strategy configuration was canceled because "svi_client._3_11" failed
|
|
SVI Client (3.10)
The operation was canceled.
|
|
SVI Client (3.10)
The strategy configuration was canceled because "svi_client._3_11" failed
|
|
NWIS Client (3.12)
The operation was canceled.
|
|
NWIS Client (3.12)
The strategy configuration was canceled because "nwis_client._3_11" failed
|
|
SVI Client (3.12)
The operation was canceled.
|
|
SVI Client (3.12)
The strategy configuration was canceled because "svi_client._3_11" failed
|