Skip to content

Weekly Slow Unit Tests #209

Weekly Slow Unit Tests

Weekly Slow Unit Tests #209

Triggered via schedule September 1, 2025 10:14
Status Failure
Total duration 1m 7s
Artifacts
Matrix: REST Client
Matrix: Events
Matrix: Metrics
Matrix: NWM Client
Matrix: NWIS Client
Matrix: SVI Client
Fit to window
Zoom out
Zoom in

Annotations

14 errors
SVI Client (3.11)
Process completed with exit code 1.
NWIS Client (3.11)
Process completed with exit code 1.
NWIS Client (3.10)
Process completed with exit code 1.
NWIS Client (3.10)
The strategy configuration was canceled because "nwis_client._3_11" failed
NWIS Client (3.9)
Process completed with exit code 1.
NWIS Client (3.9)
The strategy configuration was canceled because "nwis_client._3_11" failed
SVI Client (3.10)
The operation was canceled.
SVI Client (3.10)
The strategy configuration was canceled because "svi_client._3_11" failed
SVI Client (3.12)
The operation was canceled.
SVI Client (3.12)
The strategy configuration was canceled because "svi_client._3_11" failed
NWIS Client (3.12)
Process completed with exit code 1.
NWIS Client (3.12)
The strategy configuration was canceled because "nwis_client._3_11" failed
SVI Client (3.9)
The operation was canceled.
SVI Client (3.9)
The strategy configuration was canceled because "svi_client._3_11" failed