Weekly Slow Unit Tests #185
run_slow_unit_tests.yml
on: schedule
Matrix: REST Client
Matrix: Events
Matrix: Metrics
Matrix: NWM Client
Matrix: NWIS Client
Matrix: SVI Client
Annotations
7 errors
|
NWM Client (3.8)
Process completed with exit code 2.
|
|
NWM Client (3.9)
The operation was canceled.
|
|
NWM Client (3.9)
The strategy configuration was canceled because "nwm_client._3_8" failed
|
|
NWM Client (3.10)
The operation was canceled.
|
|
NWM Client (3.10)
The strategy configuration was canceled because "nwm_client._3_8" failed
|
|
NWM Client (3.12)
The operation was canceled.
|
|
NWM Client (3.12)
The strategy configuration was canceled because "nwm_client._3_8" failed
|