Skip to content

chore(deps)(deps): bump github.com/go-playground/validator/v10 from 10.27.0 to 10.28.0 #134

chore(deps)(deps): bump github.com/go-playground/validator/v10 from 10.27.0 to 10.28.0

chore(deps)(deps): bump github.com/go-playground/validator/v10 from 10.27.0 to 10.28.0 #134

Triggered via pull request October 6, 2025 22:29
Status Failure
Total duration 28s
Artifacts

go.yml

on: pull_request
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Test (1.23)
Process completed with exit code 1.
Test (1.24)
The operation was canceled.
Test (1.24)
The strategy configuration was canceled because "test._1_23" failed