Skip to content

chore(deps): update dependency crypto-ld to v7 #4511

chore(deps): update dependency crypto-ld to v7

chore(deps): update dependency crypto-ld to v7 #4511

Triggered via pull request February 7, 2025 15:54
Status Failure
Total duration 4m 11s
Artifacts 2

tests.yml

on: pull_request
check_skip
0s
check_skip
cache_imgs
7s
cache_imgs
bundle_cache
33s
bundle_cache
Matrix: test
Matrix: integration_test
Matrix: bundle_test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (22, optional)
Process completed with exit code 1.
test (20, required)
Process completed with exit code 1.
test (18, required)
The job was canceled because "_20_required" failed.
test (18, required)
The operation was canceled.
integration_test (latest-develop, optional)
Process completed with exit code 1.
integration_test (latest, required)
Process completed with exit code 1.
test (16, optional)
The job was canceled because "_20_required" failed.
test (16, optional)
The operation was canceled.
bundle_test (latest-develop, optional)
Process completed with exit code 1.
bundle_test (latest, required)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size Digest
build Expired
76.7 MB
sha256:025d755921bcc81b895a50e8ebdbc258ef0442ad1d6feb4f69339cfa953c0b6b
checked-nonmin-bundle Expired
892 KB
sha256:4ee0928108e63fefb9764c0512833eed25348253744b22ea5b5b4767c392631b