chore: Kilt foundation #4508
tests.yml
on: pull_request
Annotations
5 errors
integration_test (latest-develop, optional)
Process completed with exit code 1.
|
integration_test (latest, required)
Process completed with exit code 1.
|
bundle_test (latest, required)
Process completed with exit code 1.
|
bundle_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
|
bundle_test (latest-develop, optional)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
build
Expired
|
76.7 MB |
sha256:5604770e83c08500a8f90643e2222c423d91eb9c12b79685226e99a73807bb65
|
|
checked-nonmin-bundle
Expired
|
892 KB |
sha256:a8150e873ac2975c808f6190aec2eeadb3de12f1ed175073f042f35fdacc001d
|
|