chore: Kilt foundation #4507
tests.yml
on: pull_request
Annotations
6 errors
integration_test (latest, required)
Process completed with exit code 1.
|
integration_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
|
integration_test (latest-develop, optional)
Process completed with exit code 1.
|
bundle_test (latest, required)
Process completed with exit code 1.
|
bundle_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
|
bundle_test (latest-develop, optional)
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
build
Expired
|
76.7 MB |
sha256:561bb434f8383c6a2f265d949524ffa61b5c382c5b3131e0058f69857cf79adc
|
|
checked-nonmin-bundle
Expired
|
892 KB |
sha256:0fcb6cf2e5a69a3d55753d6f7640de3ed1823ae9273041d1051b981092396ead
|
|