chore: Kilt foundation #4506
tests.yml
on: pull_request
Annotations
6 errors
integration_test (latest, required)
Process completed with exit code 1.
|
integration_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
|
integration_test (latest-develop, optional)
The operation was canceled.
|
bundle_test (latest, required)
Process completed with exit code 1.
|
bundle_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
|
bundle_test (latest-develop, optional)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
build
Expired
|
76.7 MB |
sha256:ebd5488fbe5e049f1e683a9d0e15695e65d5829f112718d5fb2ede8b4fe003d3
|
|
checked-nonmin-bundle
Expired
|
892 KB |
sha256:801bac0d25d410361932385d17a49601008dce99d3f36424127492cf4b59d6e5
|
|