chore: Kilt foundation #4505
tests.yml
on: pull_request
Annotations
5 errors
integration_test (latest, required)
Process completed with exit code 1.
|
integration_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
|
integration_test (latest-develop, optional)
The operation was canceled.
|
bundle_test (latest-develop, optional)
Process completed with exit code 1.
|
bundle_test (latest, required)
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
build
Expired
|
76.7 MB |
sha256:b23725842d4a3b3683773e5dac0248d01d79f6543e72594f2041ad5f1a6ac1ea
|
|
checked-nonmin-bundle
Expired
|
892 KB |
sha256:51cf4de43f2026f348210bcc9ba35e380c03b88350476c690329c8b25e8c2057
|
|