Skip to content

Chore/maintenance

Chore/maintenance #357

Triggered via pull request June 19, 2025 08:48
Status Failure
Total duration 1m 7s
Artifacts

test.yml

on: pull_request
Matrix: linux-test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
linux-test (3.8)
Process completed with exit code 1.
linux-test (3.11)
The operation was canceled.
linux-test (3.11)
The strategy configuration was canceled because "linux-test._3_8" failed
linux-test (3.10)
The operation was canceled.
linux-test (3.10)
The strategy configuration was canceled because "linux-test._3_8" failed
linux-test (3.9)
The operation was canceled.
linux-test (3.9)
The strategy configuration was canceled because "linux-test._3_8" failed
linux-test (3.12)
The operation was canceled.
linux-test (3.12)
The strategy configuration was canceled because "linux-test._3_8" failed