chore(deps): update actions/checkout digest to 1e31de5 (#24612) #3
ci-build.yaml
on: push
changes
8s
shellcheck
12s
Ensure Go modules synchronicity
39s
Lint Go code
8m 18s
Check changes to generated code
6m 19s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
10m 45s
E2E Tests - Composite result
3s
Process & analyze test artifacts
0s
Annotations
5 errors and 2 warnings
|
Run end-to-end tests (v1.31.0, false)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run end-to-end tests (v1.32.1, false)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run end-to-end tests (v1.33.1, true)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run end-to-end tests (v1.30.4, false)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
E2E Tests - Composite result
Process completed with exit code 1.
|
|
changes
Previous commit b4e626c9ebce71e90e46bec19b7a56763f70439d is not valid. Using parent commit.
|
|
changes
Unable to locate the commit sha: b4e626c9ebce71e90e46bec19b7a56763f70439d
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
race-results
|
1.47 MB |
sha256:b26b8f94357c5da6bef07dbaadc07fb577fba23363e79f687c0470eadad3b5f6
|
|
|
test-results
|
1.46 MB |
sha256:4a787d5e349a6aa7232342a94fdd302b3a82c30ab3e94c3df22635abaf4ddd99
|
|