chore(ci): run e2e tests on CNCF runner (#24320) #1
ci-build.yaml
on: push
changes
6s
shellcheck
9s
Ensure Go modules synchronicity
57s
Lint Go code
7m 40s
Check changes to generated code
6m 15s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
10m 32s
E2E Tests - Composite result
2s
Process & analyze test artifacts
0s
Annotations
5 errors and 2 warnings
|
Run end-to-end tests (v1.33.1, true)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run end-to-end tests (v1.31.0, false)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run end-to-end tests (v1.30.4, false)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run end-to-end tests (v1.32.1, false)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
E2E Tests - Composite result
Process completed with exit code 1.
|
|
changes
Previous commit 88fccc91c67eb9145691ae93e3b995d949ecd41c is not valid. Using parent commit.
|
|
changes
Unable to locate the commit sha: 88fccc91c67eb9145691ae93e3b995d949ecd41c
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
race-results
|
1.44 MB |
sha256:18cb29af9797f32be7c9253c73d9a74f1de8e816819fc97cb3b4bbaa60515b98
|
|
|
test-results
|
1.44 MB |
sha256:51b770948b94ae8f4994af93a00ec10b2734130628afcf98395cecf1a90d7a96
|
|