Identify the last execution of the Simple trigger #1326
Unanswered
nitulkukadia
asked this question in
Q&A
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
https://www.quartz-scheduler.org/documentation/quartz-2.3.0/tutorials/tutorial-lesson-05.html
SimpleTrigger trigger = (SimpleTrigger) newTrigger()
.withIdentity("trigger1", "group1")
.startAt(myStartTime) // some Date
.forJob("job1", "group1") // identify job with name, group strings
.build();
trigger = newTrigger()
.withIdentity("trigger3", "group1")
.startAt(myTimeToStartFiring) // if a start time is not given (if this line were omitted), "now" is implied
.withSchedule(simpleSchedule()
.withIntervalInSeconds(10)
.withRepeatCount(10)) // note that 10 repeats will give a total of 11 firings
.forJob(myJob) // identify job with handle to its JobDetail itself
.build();
here i want to identify is all the triggers has been completed i.e the 11th one.
How to get details once the last trigger is completed. I need to execute the event after completion.
Beta Was this translation helpful? Give feedback.
All reactions