Milestones

List view

  • Goal: Interaction with Scene: picking objects, pressing button that controls light on scene.

    No due date
    0/1 issues closed
  • Goal: Basic movement through scene with FPP camera: WSAD movement, jump, crouch.

    No due date
    0/3 issues closed
  • Oculus Rift will be delivered to us soon. We need to prepare our engine in order to properly render any data with the Rift and other VR systems.

    No due date
    0/2 issues closed
  • This is a milestone grouping all the tickets introducing and enhancing graphics features in the engine. Since other milestones are more important, all tasks here are lowest priority possible.

    No due date
    0/15 issues closed
  • Overall milestone to group tasks connected with porting the engine to Linux. All sub-tasks connected with Linux implementation should be assigned to this milestone.

    No due date
    3/6 issues closed
  • The milestone collects all lower priority tickets that must be done in more distant future.

    No due date
    4/28 issues closed
  • Overall milestone to group tasks connected with porting nfCommon to Linux. All sub-tasks connected with Linux implementation of nfCommon should be assigned to this milestone.

    No due date
    6/6 issues closed
  • All tasks which need to be completed in order to use nfEngine in other project. This MUST be done before our first release.

    No due date
    34/56 issues closed