Put the CED2AR v2 project releases into a Central Repository so they can be available for immediate use.
Projects and artifacts must meed certain requirements before they can be uploaded to the Central Repository. The requirements are at: Guide to uploading artifacts to the Central Repository
At first glance, the 5 CED2AR v2 project repositories:
- Do not have the required 16 metadata elements. (Most have 4 of the 16.)
- One project needs to be refactored and tested to meet the requirements. (These are breaking changes.)
- Some unused code may need to be deleted.
- Project dependencies and versions may need to be updated and tested before being uploaded.
- Projects do not have the attached javadoc and source code included in the releases. (Need to add plug-ins.)
- Projects need to have valid PGP signatures.
There will be one github issue per project.
High level tracking of these 5 git repos are in: v2 maven publishing requirements.