This repository was archived by the owner on May 22, 2025. It is now read-only.
This repository was archived by the owner on May 22, 2025. It is now read-only.
Time tracking with negative times #97
Open
Description
For some reason after I deleted the amount of time spent on some issues (which we agreed to do for free after I'd tracked them) I get an incorrect negative in my report. Am I missing some option?
Here are screenshots:
The issue itself with all time removed (first I used /spend with a negative value, then I realized there was such a thing as remove_time_spent).
Metadata
Metadata
Assignees
Labels
No labels