List of scheduling criteria
framinan edited this page Feb 7, 2022
·
6 revisions
-
Cmax(solution)
- minimize makespan or maximum completion time of the solution -
Emax(solution)
- minimize maximum earliness of the solution -
Fmax(solution)
- minimize maximum flowtime of the solution -
Lmax(solution)
- minimize maximum lateness of the solution -
Tmax(solution)
- minimize maximum tardiness of the solution -
WjCmax(solution)
- minimize weighted makespan or maximum completion time of the solution -
WjEmax(solution)
- minimize weighted maximum earliness of the solution -
WjFmax(solution)
- minimize weighted maximum flowtime of the solution -
WjLmax(solution)
- minimize weighted maximum lateness of the solution -
WjTmax(solution)
- minimize weighted maximum tardiness of the solution
-
SumCj(solution)
- minimize the sum of the completion times of the jobs in solution -
SumEj(solution)
- minimize the sum of the earliness of the jobs in solution -
SumFj(solution)
- minimize the sum of the flowtime of the jobs in solution -
SumLj(solution)
- minimize the sum of the lateness of the jobs in solution -
SumTj(solution)
- minimize the sum of the tardiness of the jobs in solution -
SumUj(solution)
- minimize the sum of the tardy jobs in solution -
SumWjCj(solution)
- minimize the sum of the weighted completion times of the jobs in solution -
SumWjEj(solution)
- minimize the sum of the weighted earliness of the jobs in solution -
SumWjFj(solution)
- minimize the sum of the weighted flowtime of the jobs in solution -
SumWjLj(solution)
- minimize the sum of the weighted lateness of the jobs in solution -
SumWjTj(solution)
- minimize the sum of the weighted tardiness of the jobs in solution -
SumWjUj(solution)
- minimize the sum of the weighted tardy jobs in solution
The criteria above are the result of the sum or the maximum of job-level indicators, such as the tardiness of each job, or the completion time of each job.