Skip to content

Schedule Time! #10

@kennyhong

Description

@kennyhong

Everything on the schedule should be confirmed by the 28th at the latest!

The Link:
https://docs.google.com/spreadsheets/d/1yh_N0KZM_W3Qp9SJLj0NZoZ26jN9j6IK1phCX5HKP4g/edit#gid=0

Notes when slotting things:

  • Don't include the "BoF By CUSEC" slots yet

  • Workshops without a company associated with the slot can be added later

  • All speaker slots are confirmed so they can all go in even if there is no speaker attached yet (This can be changed later)

  • Gather people to the hall is a note for us, not for the schedule.

  • Locations and such can be added later as well when those are confirmed

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions