Ability to Turn Off 'Task-Complete' #3433
TheMightyDman
started this conversation in
Feature Requests
Replies: 1 comment 2 replies
-
There should be tools like Task Master or "Memory Bank" that helps with this situation I think? |
Beta Was this translation helpful? Give feedback.
2 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
My Tasks are almost always marked as complete while I am part way through.
This has been worsened by my newly created roles, designed to use Gemini 05-06 as Project Manager for Claude Code. I have essentially augmented the Orchestrator Instuctions to pass me the intructions which I give to 1 of 2 Claude Code Terminals, or a Second Roo Chat in the Same Project.
This allows me to maximise for the Intelligence on context bredth of Gemini, without the rapidly accelarating prompt costs or need to continually /compress my progress and create new tasks.
Essentially every message I send comes with a "Task Complete" and I would love to be able to turn this off.
If anyones interested, The Roles I have been using are:
👨💼 Project Manager (The Boss)
👩💻 Project Administrator (This is my /compress function for moving to a new window)
🕵️ The Auditor (Conducts Systematic Reviews and Compiles Reports)
👨🏫 Project Readiness Coordinator (/init)
Happy to share my instructions for these modes
Beta Was this translation helpful? Give feedback.
All reactions