Skip to content
This repository was archived by the owner on Oct 26, 2022. It is now read-only.
This repository was archived by the owner on Oct 26, 2022. It is now read-only.

Inter-rack slice with stitching port does not show manifest correctly in Flukes #133

@YufengXin

Description

@YufengXin
  1. It shows correctly, if the VM ends are at the same rack as the stitching port is defined.
  2. inter-rack P2P (TS2-9) : one VM node at PSC, one stitching port on the bbnNet ----> shows disconnected links on the ION node. (RDF file: ts-2-9)
  3. inter-rack MP: one VM at Ciena, one VM at WSU, one sttichngport on the bonnet ---> shows a double link between the stitching port and the bonnet node. (RDF file: mp-st-2)

@ibaldin would you pls modify the attached manifest files to make them show correctly at Flukes, then I will try to generate the right RDF accordingly? I tried manually modifying the RDF, but could not make them work.

The inter-rack MP case maybe useful because the two VM branches show correctly.

ts-2-9.rdf.txt
ts-2-9-manifest.rdf.txt
mp-st-2.rdf.txt
mp-st-2-manifest.rdf.txt

Metadata

Metadata

Labels

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions