Skip to content

Commit 96eed78

Browse files
committed
feat: add build-guide in PDF
Compiled with Obsidian
1 parent 0c59fdd commit 96eed78

File tree

3 files changed

+6
-3
lines changed

3 files changed

+6
-3
lines changed

.gitignore

Lines changed: 4 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -2,4 +2,7 @@
22

33
# KiCAD stuff
44
*fp-info-cache
5-
*.kicad_prl
5+
*.kicad_prl
6+
7+
# Pandoc files
8+
*.log

docs/build-guide.md

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -17,7 +17,7 @@ The items that have an asterisk can be replaced with others that better suit you
1717
| 110mAh Li-Po Battery | 2 | https://typeractive.xyz/products/lithium-battery-110mah?variant=46118748291303 |
1818
| Cirque Trackpad 35mm | 1 | https://eu.mouser.com/ProductDetail/Cirque/TM035035-2024-002?qs=wd5RIQLrsJijxpRBQzhwPg%3D%3D |
1919
| Alps C11 Rotary Encoder | 1 | https://mechboards.co.uk/products/kit-components-and-parts?variant=55527712260476 |
20-
| Choc Switches | 40 [] | https://holykeebs.com/products/ambients-silent-choc-switches?variant=47849514860834 |
20+
| Choc Switches | 40 [^4] | https://holykeebs.com/products/ambients-silent-choc-switches?variant=47849514860834 |
2121
| Choc Keycaps | 34 | https://typeractive.xyz/products/mbk-keycaps?variant=45419753111783 |
2222
| Choc Keycaps Homing | 2 | I forgot, but I would buy: https://typeractive.xyz/products/mbk-keycaps?variant=45419753177319 |
2323
| FPC Cable (12 conductors, 0.5 mm pitch) | 1 | https://eu.mouser.com/ProductDetail/Molex/15266-0120?qs=R8Vl3J6srxxjZ%2FhzpHORiQ%3D%3D |
@@ -249,7 +249,7 @@ This is the easy part!
249249
3. Put a nut inside each of the hexagonal containers of the bottom of the case/chassis and lay the keyboards flat.
250250
4. Put a washer in the short screws (10 mm ones) and drive them through the mounting holes of the plate, PCB and case, then screw them into the nut by hand, and secure each of them with a screwdriver without applying too much pressure. In the image shown below you can see the location of all the 4 screws + the 2 long ones for the trackpad:
251251

252-
![assets](../assets/bg-screw-positions.jpg)
252+
![Screw Positions](../assets/bg-screw-positions.jpg)
253253

254254
5. The left side is done. On the right side, connect the FPC cable into the connector that is soldered onto the PCB.
255255
6. Then, align the trackpad holder into its correct position over the case and screw it in the same way as in Step 4, but use this time the 15 mm screws.

docs/build-guide.pdf

25.3 MB
Binary file not shown.

0 commit comments

Comments
 (0)