Skip to content

Merge branch 'master' into release #10

Merge branch 'master' into release

Merge branch 'master' into release #10

Triggered via push July 22, 2025 01:37
Status Failure
Total duration 39m 22s
Artifacts 1
Matrix: build_vcpkg
Fit to window
Zoom out
Zoom in

Annotations

7 errors, 1 warning, and 2 notices
build-vcpkg-macos-latest-11
Process completed with exit code 1.
build-vcpkg-windows-latest-11
The operation was canceled.
build-vcpkg-windows-latest-11
The strategy configuration was canceled because "build_vcpkg.macos-latest_11" failed
build-vcpkg-ubuntu-latest-11
The operation was canceled.
build-vcpkg-ubuntu-latest-11
The strategy configuration was canceled because "build_vcpkg.macos-latest_11" failed
build-vcpkg-ubuntu-latest-12
The operation was canceled.
build-vcpkg-ubuntu-latest-12
The strategy configuration was canceled because "build_vcpkg.macos-latest_11" failed
build-vcpkg-macos-latest-11
ninja 1.13.1 is already installed and up-to-date. To reinstall 1.13.1, run: brew reinstall ninja
build-vcpkg-macos-latest-11
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520
build-vcpkg-macos-latest-11
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520

Artifacts

Produced during runtime
Name Size Digest
et-client-ubuntu-latest-gcc13 Expired
44.4 MB
sha256:87c666c04b4c6fc1752cf4e5fd79ee4cc496e681d31b24e5ccd046404adbcd2a