-
Notifications
You must be signed in to change notification settings - Fork 1
Open
Description
I think we may have found a bug in zone budget (in zonbudusg, but also likely in structured zone budget), and I wanted to get your opinion to see if I am missing something obvious. Here is the situation:
- Compact budget option is NOT used
- Wells are on in stress period 1 but later, the number of active wells is specified as 0
- Zone budget is asked to write a CSV2 file
In this situation, the non-compact budget file has an entry for WELLS in stress period 1, but it does not have an entry later on. It appears that zone budget gets confused for the CSV2 case because the number of columns has changed.
Does this sound like something you have encountered or seen before? When I run the model with COMPACT BUDGET everything works as expected.
If this is a bug, it seems like a fix would be to read through the entire budget file and determine names for all of the columns, and then go back and process the file.
Metadata
Metadata
Assignees
Labels
No labels