Skip to content

Trigger missed #56

@andriussi

Description

@andriussi

Hi
I just encountered orchestrator skipping one scheduled robot. After looking at the console I noticed, that it did a restart at 10:01:02 and the robot was supposed to run at 10:01:00. However in this case i guess the 10:01:00 happened while the orchestrator was restarting.

I think it would be useful to have a check that there are no robots scheduled in the next 5 mins or so before doing the restart.

Console:
image

Schedule:
image

Executions:
image

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions